Skip to content
Pigeons under the panels? Ask about critter guard (815) 324-1338
Solar Panel Removal Homer Glen logo

Reroofing beneath solar

Homer Glen Roof Replacement Under Solar Panels, Planned in Sequence

Lift-off, the new roofing and remounting arranged on one timeline, so the project keeps moving and nothing sits idle.

Weathered gray shingles on a sloped roof

Coordinating Two Trades on One Roof

A new roof beneath a solar array relies on two trades working in a fixed order, because the array has to be lifted off before the old shingles can be stripped and cannot be hung back until the new roofing is finished, and whenever those steps are arranged separately the delays tend to stack up, with equipment sitting in storage longer than it should or a roofing crew arriving to find the modules still in place. Solar Panel Removal Homer Glen sidesteps that by laying out the whole project as a single timeline from the first survey. Lift-off is fixed first, the roof replacement then takes place on a bare deck within that same timeline, and remounting is dated to begin as soon as the roofing crew signs off. We make no claims here about shingle products or roofing systems; the value we add lies entirely in the coordination. With the new roofing in place, fresh attachment points are sealed in according to the shingle maker's specifications, the modules return to their coded slots, and the system is reconnected and recommissioned against the generation figure recorded at the outset. On the larger roofs and arrays found across Homer Glen, one timeline keeps a sizable project orderly.

Elements of the Single Timeline

Each stage arranged so it hands off without a gap.

  • Dates fixed together

    Lift-off, roof replacement and remounting scheduled at the outset.

  • Recorded lift-off

    Photographs and a generation figure, then isolation and removal.

  • Coded storage

    Each module marked to its slot and kept safe during the reroof.

  • An unobstructed deck

    No solar hardware in the way while the roofing goes on.

  • Fresh attachment points

    New mounts sealed into the new roofing with new flashing.

  • Remounting and recommissioning

    Modules hung back, circuits restored and generation verified.

Order of Operations

  1. Timeline set

    Our technicians survey roof and array together, quote a firm amount by phone, usually within 48 hours, and put a date on every stage.

  2. Lift-off and new roofing

    The array is isolated, carried down and stored, and then the shingles are replaced on the bare deck.

  3. Remounting

    Fresh attachment points are sealed in, the modules go back to their slots and the system is recommissioned and recorded.

Benefits of a Single Timeline

  • Less time offline

    Stages dated end to end keep the array out of service no longer than the roofing requires.

  • Clear responsibility

    One timeline and one contact for everything on the solar side.

  • Mounts made for the new roofing

    Fresh attachment points replace hardware from the old shingles.

  • One timeline, three stages
  • Deck left bare for roofers
  • Attachments resealed
  • Generation verified

Has the Roof Beneath Your Array Reached Its Limit?

Phone to have lift-off, the new roofing and remounting arranged on one timeline.